Chapter 3
Rough Plumbing
Students read the utility and supply plans, practice with PEX on a workbench, then follow the hot- and cold-water supply lines, the toilet flange and the rough waste system.
Why it matters: Plumbing runs inside the walls and floor, so it has to be planned and checked before the house is closed in.
Overview video. The course opens this chapter with a short introduction before the build lessons.
Lessons and topics
- Plumbing plans and PEX workbench Video lesson
- Read the utility box and hot- and cold-water supply drawings, and identify PEX supply components in a bench demonstration.
- Hot- and cold-water supply lines Video lesson
- Follow the layout and installation of the supply lines through the structure.
- Toilet flange Video lesson
- Review how the toilet connects to the waste system at the floor.
- Rough plumbing waste system Video lesson
- Follow the combined lessons on the waste system and how it fits into the rest of the rough-in.
Download in the course portal. Scaled rough plumbing plan covering the utility box, water supply and waste drainage.
Plan and stage
Use the scaled rough plumbing plan to coordinate the utility box, supply and waste routes. Use the PEX workbench demonstration to review the fittings before the rough-in.
Document for review
Record PEX and fittings, waste pipe and fittings, and the installed supply and drainage layouts. The checklist also identifies product labels for the water heater and shower valve, plus the plumbing workbook checks.
Next: Electrical rough-in follows in the same open walls, and the two trades are coordinated through the project plans.