Building Envelope & Ventilation

Enclose the structure and keep water out with sheathing, housewrap, roofing, windows, doors, and cladding. Then cover heating, cooling, and ventilation.

← All Build Program chapters

Chapter 5

Sheathing, Shear & Housewrap

Students install eave and fascia blocking and wall sheathing and shear, cut the framed openings through the sheathing, then apply housewrap.

Why it matters: Sheathing stiffens the structure and housewrap is the first layer that sheds water, so this chapter is where the house starts to be weather-resistant.

Overview video. The course opens this chapter with a short introduction before the build lessons.

Lessons and topics

Eave and fascia blocking Written overview
Review the blocking at the roof edge and how it fits into the sheathing sequence.
Wall sheathing and shear walls Video lesson
Learn how exterior sheathing contributes to the structure.
Door and window openings Video lesson
Locate and cut the framed openings through the sheathing.
Housewrap Video lesson
Cover the weather-resistive layer before windows, doors, and cladding go on.

Course resource in the course portal. Chapter documents are collected in the Project Downloads.

Plan and stage

Use the Project Downloads and keep sheathing ratings, fasteners and adhesive information available for the chapter checks. The written lesson places fascia blocking before or after sheathing, depending on the build sequence.

Document for review

Record sheathing ratings and fasteners, the squared framing, fascia blocking, and the framing or sheathing details requested in the chapter checklist.

Next: With the walls wrapped, the roof is next so the shell can be protected from above.

Chapter 6

Roofing

Students prepare the fascia and roof sheathing, install underlayment and roof panels, and finish the roof with trim.

Why it matters: A properly built roof keeps water out of everything built below it.

Lessons and topics

Fascia and roof sheathing Video lesson
Prepare the roof edge and roof deck for the exterior roof layers.
Roofing overview and underlayment Video lesson
Review the roofing sequence and where underlayment fits in the assembly.
Roof panels and trim Video lesson
Cover the roof panels and finishing trim that complete the roof’s exterior.

Course resource in the course portal. Chapter documents are collected in the Project Downloads.

Plan and stage

Plan safe roof access and fall protection for students and instructors, and schedule roofing for dry weather.

Document for review

Keep roofing panel specifications and labels for fasteners, sealant and butyl tape. Use the chapter checklist for photographs of the roof assembly and trim.

Next: A closed roof allows windows and doors to be fitted with the structure protected.

Chapter 7

Windows & Doors

Students recheck level, install windows and the entry door, and fit the interior pocket doors.

Why it matters: Windows and doors only work correctly in a square, level frame, and they are key points for keeping water out.

Lessons and topics

Level check Written overview
Recheck the trailer and structure before fitting windows and doors.
Window installation Video lesson
Review how windows fit into prepared rough openings and the exterior water-management assembly.
Entry door installation Video lesson
Cover fitting the exterior door and checking how it operates.
Pocket doors Video lesson
Review how an interior sliding door fits into the framing.

Course resource in the course portal. Chapter documents are collected in the Project Downloads.

Plan and stage

Recheck the trailer level before fitting openings. Keep window specifications, flashing products and the entry and interior door materials available.

Document for review

Keep window specifications and labels for the fasteners, flashing, sealants and interior door. Document the flashing and installed openings as the chapter checklist directs.

Next: With openings installed, the exterior cladding can be added around them.

Chapter 8

Exterior Cladding

Students install the rainscreen, then the siding or cladding, then the exterior trim.

Why it matters: Cladding is the visible face of the house and, with the rainscreen, part of how the wall manages water.

Lessons and topics

Rainscreen Video lesson
Learn how the space behind the siding helps manage water.
Cladding and siding Video lesson
Follow the exterior siding installation covered in the course.
Exterior trim Video lesson
Review the trim that finishes the cladding and its transitions.

Course resource in the course portal. Chapter documents are collected in the Project Downloads.

Plan and stage

Confirm your selected cladding and follow its manufacturer instructions.

Document for review

Record siding specifications, fastener labels, edge flashing and, where applicable, rainscreen material. For cladding with an integrated rainscreen, use the manufacturer documentation.

Next: With the exterior complete, heating, cooling and ventilation equipment is set up.

Chapter 9

HVAC & Vents

Students set up the ductless mini-split, install plumbing vent caps and install bath or wall vent fans.

Why it matters: These items connect the house to the outdoors, so they have to be installed and sealed with care.

Lessons and topics

Ductless mini-split setup Written overview
Review the basic layout of the heating and cooling system used in the project.
Plumbing vent caps Written overview
Cover the finishing and sealing of plumbing vent terminations.
Bath and wall vent fans Written overview
Study through-wall ventilation and the role of manufacturer installation instructions.

Course resource in the course portal. Chapter documents are collected in the Project Downloads. Use the manuals for the equipment selected.

Plan and stage

Gather the manuals for the mini-split and ventilation products. The written fan lesson covers the wall and exterior vent components here and places the finished fan assembly after the interior wall covering.

Document for review

Record the heating or cooling unit specifications and ventilation fan labels. The checklist also calls for evidence of vent caps, through-wall sealing materials and, where used, exterior compressor mounting.

Next: The shell is now complete, so work moves to insulation and the interior.

Documentation and certification

Use the licensed course’s chapter checklists and workbook to record evidence as the build progresses. Instructors submit chapter evidence through the course and complete the chapter confirmation. Some chapters require inspector approval before the school can proceed. The chapter examples above summarize what the course asks instructors to document.