Build Program · Phase 6 · Chapters 14–16

Final Fixtures, Testing & Certification

Finish the plumbing, electrical, fixtures, and hardware. Then check the operation of each system and assemble the documentation for certification review.

← All Build Program chapters

Chapter 14

Finish Plumbing, Electrical & Fixtures

Students install selected fixtures and appliances and make the finish plumbing and electrical connections, following the manufacturer instructions for each.

Why it matters: This is where the rough-in work becomes a working kitchen and bathroom.

Lessons and topics

Fixtures, appliances, and finish connections Written overview
Review finish plumbing and electrical items and the installation manuals for the specific fixtures and appliances selected for the build.

Course resource in the course portal. Chapter documents are collected in the Project Downloads. Use the selected fixture and appliance manuals for installation.

Plan and stage

Keep the manufacturer manuals for the chosen sinks, faucets, shower trim, electrical fixtures, and appliances. Coordinate finish tests and retain the product labels used for review.

Document for review

Document fixtures and appliances before and after installation, electrical test results or electrician sign-off where the checklist allows, outlet polarity, water supply and drain tests, and a labeled, completed panel.

Next: Remaining hardware and touch-ups finish the build.

Chapter 15

Finish Hardware & Touch-Ups

Students install the remaining hardware and complete a final fit-and-finish review.

Why it matters: A careful final review catches small items before testing and submission.

Lessons and topics

Final hardware and finish corrections Written overview
Complete the remaining hardware and use a final pass to identify finish items that need attention.

Course resource in the course portal. Chapter submission checklist and the corresponding quality-assurance workbook entries.

Plan and stage

Set aside time for a full walkthrough with a punch list.

Document for review

Record installed cabinet, entry and bathroom hardware, any paint repair before and after, and the applicable quality-assurance entries in the workbook.

Next: With the home finished, the class moves to final testing and certification submission.

Chapter 16

Final Testing, Health & Safety, and Certification Submission

Students check that plumbing, electrical, HVAC, ventilation, windows and doors operate, record interior and exterior walkthroughs, confirm fire and life safety items, assemble quality-control records, submit them and organize the product manuals and transport-readiness checks.

Why it matters: This chapter pulls the whole project together into the record that supports certification review of the completed home.

Lessons and topics

System checks and walkthrough Written overview
Check plumbing, electrical, HVAC and ventilation, and window and door operation. The chapter calls for walkthrough and exterior video documentation.
Fire and life safety Written overview
Review required safety items and labels, including smoke and carbon monoxide alarms and fire extinguishers as applicable.
Certification documentation Written overview
Gather completed quality-control records and supporting media from earlier chapters and submit them for review.
Project handoff and transport readiness Written overview
Organize appliance and product manuals and review the course’s pre-trip checks for the finished unit.

Course resource in the course portal. Final media submission checklist, confirmation assessment, and completed certification workbook.

Plan and stage

Gather the project’s earlier media and quality-assurance and test records before the final walkthrough. The course warns that completing the final confirmation closes course access, so save the workbook and records before confirming.

Document for review

The final checklist asks for labeled safety equipment, safety-label placement, egress opening measurements, videos of water, drains, appliances and HVAC in operation, and interior and exterior walkthroughs beginning at the trailer VIN.

What happens after final submission?

  1. Submit the final chapter photos, walkthrough videos and workbook progress through the course. Complete the chapter confirmation assessment after uploading the required evidence.
  2. The school receives a final email to complete and sign. Once it is signed, an inspector from the third-party inspection agency reviews the submitted evidence and workbook progress.
  3. If the chapter passes review, the agency sends a signed confirmation. The school can then upload the fully completed certification workbook through the submission link in the workbook.
  4. Apply the certification label to the unit once it arrives. Placement and occupancy still depend on applicable approvals.

Documentation and certification

Use the licensed course’s chapter checklists and workbook to record evidence as the build progresses. Instructors submit chapter evidence through the course and complete the chapter confirmation. Some chapters require inspector approval before the school can proceed. The chapter examples above summarize what the course asks instructors to document.